Taylor Yard Pedestrian and Bicycle Bridge Project

The distinctive, orange steel bridge will connect the Elysian Valley community to the planned Taylor Yard G2 River Park on the east side of the LA River. The bridge is designed for bike and pedestrian use, is 400 feet long and will be supported by abutments and a concrete pier in the center of the river.

bike_ped_bridge3_2.jpg
G2_IFR Rendered Plans small 2020-1124_Page_5...jpg

Proposition O Water Quality Improvement Project

The City of Los Angeles will be initiating a Water Quality Improvement Project at Taylor Yard. The project will provide tremendous benefits to the public while improving the environment at Taylor Yard. This project is funded by Proposition O. 

Phyto-Myco Remediation Study at Taylor Yard G2 Parcel

The 100 Acre Partnership is collaborating with the University of California Riverside to test a soil clean up method at the G2 Parcel at Taylor Yard. This study will include the use of native plants and fungi to test their effectiveness to remediate the soil at Taylor Yard. Click here to view a presentation on the study.

Phytoremedation Project 1.jpg

Rio de Los Angeles Field Maintenance Project

The Rio de Los Angeles State Park Fields Maintenance Improvements Project (Project) will include renovation of the three existing fields located at the south end of the Rio de Los Angeles State Park. The three existing fields will be remade to include synthetic and natural turf soccer and American football fields.

25144522_EN9TO0kLtS58g5QIks3elb0snkGj2WQIn5THNBc7wBA.jpg
slideshow%203_edited.jpg

Community Taylor Yard Equity Strategy
(Community TYES) Project

The 100 Acre Partnership is collaborating with the University of California Riverside to test a soil clean up method at the G2 Parcel at Taylor Yard. This study will include the use of native plants and fungi to test their effectiveness to remediate the soil at Taylor Yard. 

Bowtie Aerial_210721.jpg

-The Bowtie-
Rio de
Los Angeles State Park

With early planning efforts getting started for several projects on and adjacent to the Bowtie, California State Parks is launching a community listening and engagement process as a critical next step in moving the Bowtie vision forward.

Taylor Yard
G2 River Park Project
Implementation Feasibility Report (IFR)

The Implementation Feasibility Report (or pre-design report) is a study of the 42-acre brownfield designated as the G2 Parcel at Taylor Yard. The purpose of the IFR to assess the potential and challenges at the site and will assist in determining next steps. 